![]() Utility trim, sometimes called undersill trim, is installed on a horizontal surface to cover the exposed top-edge of vinyl siding. Measure the walls along the bottom of all the siding to estimate starter strip material. You’ll typically need this around the bottom of the wall. Starter strips are used at the bottom of a wall to provide a solid attachment for the bottom of a piece of vinyl siding and to fur out the bottom of the piece for an even look. Add the measurements of all of these surfaces to find how much J-channel will be needed. ![]() It can also be used for inside corners or where vinyl siding meets another form of siding or trim. This is often used to cover the edges of windows and doors and the top of the wall beneath the soffit. J-channel is a trim piece that is used to cover the exposed edges on the sides of vinyl siding. The calculator above will also estimate the amount of trim pieces needed based on the number of doors and windows and the size of the project. Multiply each length and height measurement to find the square footage of each wall, then add them together to find the total square footage.ĭivide the total by 100 to find the number of squares of vinyl siding to order.įinding How Much Trim is Needed for a Vinyl Siding InstallationĮstimating the amount of trim needed for your vinyl siding project starts with understanding what trims are available and where they should be installed.įrom there, it is possible to measure all of the areas for trim to calculate the trim needed for the project. Start by measuring the height and width of each wall of the building. To find the number of squares, measure the square footage and divide by 100.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |